East York home’s transformation a tale of ravaged to renaissance

topic of the articles

Once upon a time, on a quiet crescent in east Toronto, a “For Sale” sign sat on the front yard of a post-war 1950s home. The house was in tragic condition. A pie-shaped lot presented some trying limitations, but it was well situated in an excellent neighbourhood, and had a private driveway with an attached garage. Buyers without construction or design knowledge might not see the opportunity to develop a great family home on this property, but luckily, the new homeowners did. The young couple came to us with excitement, a great attitude, and willing to let our team design and build a house that could meet their growing family’s needs.

Master plan and permits

However, this project was no small undertaking. Designing and getting approval of the plans proved to be more challenging than the construction itself. We explored several preliminary plan options, researched the zoning restrictions for the property, and visited the Committee of Adjustments for zoning variances. The final decision was to do a whole interior and exterior renovation project. This included raising the ground-floor ceiling height and rebuilding the second floor; creating a new third-floor study in the attic space; adding a two-storey rear addition with finished basement below; renovating and finishing the existing basement space; and completely remodelling the existing ground floor.

Ground floor greatness

The homeowners had a strong preference to gain more ceiling height on the ground floor, which led to the decision to destroy and rebuild the existing second floor entirely. With new 10-ft. ceilings, we wanted to optimize the space for better living and entertaining, so we decided to remove the walls between the living room and dining room to allow for a better connection to the new, contemporary kitchen. After enlarging the existing garage, we then converted the existing kitchen into a new mudroom and powder room. Overall, the design of the ground floor was intended to be functional for a family to grow and entertain in.

Privacy matters

On the newly rebuilt second floor, we constructed four bedrooms, three bathrooms and a laundry room. The master bedroom features a walk-in closet and a four-piece ensuite with double vanity. Two of the three remaining bedrooms have private access to their own full bathroom. The second floor is spacious enough to accommodate the entire family, and laid out in a way that provides the master bedroom with privacy.

Light and bright attic

To keep the overall height of the house feeling reasonably scaled, we arrived at the design of a unique roof shape that allowed for a generous third floor, which is minimally visible from the street. The third floor addition in the attic is a great feature to the house, as it is open-concept, light-filled and has a walk-out balcony.

Room to spare

Finally, the existing basement and addition were designed as an extension to the family’s living and entertaining space. A spacious recreation/movie room takes up a sizable portion at the front of the basement, while a guest bedroom and washroom add yet another sleeping arrangement to the overall house. There is plenty of designated storage in the basement, and a small home gym as well. The project in East York is one that our team is very proud of. We managed to deliver one family’s dream home, on a property in which they took a sizable risk on purchasing. With the meaning of home taking on a whole new meaning this year, our city, and world, is reminded just how important it is to love the physical space – from function, comfort and design – to make your home the safe haven we all crave.

Photos: Valerie Wilcox


Jessica Millard
Jessica Millard
"Jessica Millard joined Men At Work Design Build in 2017 while studying at Ryerson University. The Toronto-based firm offers integrated engineering, design and professional construction services for addition and major renovation projects on old Toronto homes. Jessica has been involved in various internal departments within the firm,and is currently the company’s Project Coordinator."
6 articles